The main equipments include
cement mill, separator, filter, bucket elevator and etc. The clinker is first ground by cement mill, then through the bucket elevator, the ground cement is sent to separator, and the separator is connected with filter, then the qualified powder will be sent to cement silo by bucket elevator.
By the way, the height of bucket elevator is decided by the separator position.